Raised floors

Mike Loewen mloewen at cpumagic.scol.pa.us
Thu Dec 11 07:58:18 CST 2008


On Thu, 11 Dec 2008, Jules Richardson wrote:

> Maybe the sheer weight of the cabling needed for a mainframe environment 
> was just too much to justify running it overhead?

    The SAGE installations used overhead wiring in cable trays.  They 
didn't come much bigger than that.


Mike Loewen				mloewen at cpumagic.scol.pa.us
Old Technology	http://sturgeon.css.psu.edu/~mloewen/Oldtech/