Us locals have are own green power infection.
The are in final approval to install fours quare miles of solar down the
road.
Luckly, I don't have to look at it. Strangely, My son designed its
infrastructure.
Jim
FYI: Goldendale Wa. :Carriger Solar is a proposed solar photovoltaic (PV)
electric generating facility
with a capacity of 160 megawatts (MW) of alternating current (AC) solar
.
On Sat, Oct 18, 2025 at 3:22 PM Van Snyder via cctalk <cctalk(a)classiccmp.org>
wrote:
On Sat, 2025-10-18 at 21:24 +0000, Martin Bishop
wrote:
the headline closure a year ago was the Port
Talbot blast furnaces -
reputedly to be replaced by electric arc furnaces
Good luck keeping them going with solar and wind. When the electricity
stops and the mill freezes, about all you can do is scrap it and build
a new one.
And when the electricity is occasionally working, its price is three
times what they pay in France or Finland.