In the early 70s I worked at a place that had 2 S360/40s. On the 23rd floor of a 45+ year
old building. At least 8 tape drives, 2 control units for them, 2 full banks of 2314, 2
1403 printers and 2 2540 card machines.
I would assume updated wiring would have to have been run up 23 floors. When I started
there was 1 S360/30. Don’t know if the normal building wiring would need to be updated for
that.
Show replies by date